Intercargo Workshop
Ushuaia / Argentina
2019
One of the main problems of the terminal is the current arrangement of departures and arrivals, which are located on the same level, the lack of control and security for passengers. For this reason, the project proposes to have independent bus and passenger flows, in order to optimize the operation of the terminal. Arrivals docks are resolved at the +1.00 level, leaving all affected docks at the +4.74 level for departures. Arriving passengers are led through two circulations with locked doors at level +4.74, thus concentrating all passenger flow on the same level.